Estimated Total Solar System Installed Cost-Income

Description

Amounts


7200 watt Grid-Tie System dmsolar.com

* 36x200W high quality Brightwatts photovoltaic modules

* 1x Sunny Boy SB7000US inverter

* 1x UniRac CLICKSYS flush mount**

* 1x HU361RB SQ-D 600V 30A AC/DC disconnect switch

* 3x 100'#10 AWG cable with Tyco connectors

$26,562.00


shipping

$1,500.00


Solar & Renewable Power Systems

33 Old Hickory Blvd. East Jackson TN 38305 TN

Labor and Technical Support

$2,500.00

Indoor wiring, grounds, anchors, roof mount screws,
flashing, ties,

weeb clips, weatherhead, conduit, etc

$1,000.00

Total Costs before Grant & Tax Credit

$31,562.00

Total Costs after 40% TN-CETGrant & 30% Fed Tax Credit


$13,256.00

Estimated Total Reduction in energy and other associated
costs.

Description

Past average electric bill

$1,150.00

annually

Estimated watt production

8877kwh

annually

TVA - Green Power Switch Gen Partners Program pays

$.22 per kwh

Income production


$1,953.00

annually

Maintance costs

$200.00

annually


Total Income savings-production


$1,753.00

annually